Our job in Edwardstone this week was to strengthen up existing floorboards, then lay hard board. This was followed by an insulation membrane, then another layer of ply.
Happy New Year to all our customers old and new! We have started 2023 by completing the lower roof extension over at Newton.
We're looking forward to another busy year, so please get in touch with any enquiries. You can reach us via our social media platforms, or by texting or calling on 07869 134790. Our diary is already filling fast, so if you are looking for work to be done this year, please contact us as soon as you can!
We have been working on a damp problem in Little Waldingfield. As you can see from the photo with the pictures hanging on the wall, there were movement cracks that had been caused by the damp. We installed a french drain externally and repointed the brickwork, as well as replacing all perished bricks.
Internally we lime rendered followed by lime plastering.